12.5 S4TWL Planning – P&L, ProfitCenter, CostCenter, ORder, Project : ACDOCAP

2270407 : S4TWL - Profit and Loss Planning, profit center planning, cost center planning, order planning, and project planning Reason and Prerequisites : This Simplification Item is relevant if:• Profit Center Planning is used if entries exist in Table GLPCP (check with SE16).• CO-OM Planning is used if entries exist in Table COEJ (check with … Continue reading 12.5 S4TWL Planning – P&L, ProfitCenter, CostCenter, ORder, Project : ACDOCAP

12.4 S4TWL – TECHNICAL CHANGES IN CONTROLLING

2270404 : S4TWL - Technical Changes in Controlling : from ERP ECC 6.0 (EHP 7 or higher) to S/4 HANA Business-Process Impact No impact on the standard SAP business processes (Only Technical)In Customized-Implementation migration to S/4HANA : It might be required to adapt Custom Code if fields have been added to the totals table or … Continue reading 12.4 S4TWL – TECHNICAL CHANGES IN CONTROLLING

12.3 S4TWL – Technical Changes in Material Ledger with Actual Costing

SAP NOTE# 2354768 - Technical Changes in Material Ledger with Actual Costing With S/4HANA the data model for material ledger data has been changed significantly, especially when actual costing is active. ( Actual-Costing is Active - Technically this can be verified via database table T001W, field MGVUPD. 'X' means that Material Ledger Actual Costing is active … Continue reading 12.3 S4TWL – Technical Changes in Material Ledger with Actual Costing