12.1 S4TWL – Reference and Simulation Costing : 2349294

12.1 S4TWL - Reference and Simulation Costing Application Components: CO-PC-PCP-REF System Conversion : Check existing processes for cost estimation : If You are currently using base planning objects (i.e CKHS-BZOBJ ='1' has records) to store cost estimates that can be included in cost estimates for projects, sales orders and so on as items of type … Continue reading 12.1 S4TWL – Reference and Simulation Costing : 2349294

24.5 S4TWL – DATA MODEL IN INVENTORY MANAGEMENT (MM-IM) – 2206980

T156X : T156X is a SAP standard transparent table used for storing Trans./Event Key Modification related data in SAP. It comes under the package MB 2206980 : Material Inventory Managment: change of data model in S/4HANA 1.2.2 : Fields representing a customer defined stock type or quantity/value to be aggregated If own stock types or a dimension which needs … Continue reading 24.5 S4TWL – DATA MODEL IN INVENTORY MANAGEMENT (MM-IM) – 2206980

10.1 S4TWL – DATA STRUCTURE CHANGES IN ASSET ACCOUNTING – 2270387

To be able to use new Asset Accounting in SAP S/4HANA, you have to also use new General Ledger Accounting. If you were using classic General Ledger Accounting before the conversion to SAP S/4HANA, new General Ledger Accounting is activated automatically with the conversion The data structures of Asset Accounting have changed as follows:• Actual … Continue reading 10.1 S4TWL – DATA STRUCTURE CHANGES IN ASSET ACCOUNTING – 2270387

10.2 S4TWL – Asset Accounting: Parallel valuation and journal entry – 2270388

From classic Asset Accounting to ---> using new Asset Accounting in SAP S/4HANA In S/4HANA, NEW Asset-Accounting is mendatoryIn S/4HANA, NEW GL is mendatoryThis blog thus focuses on Switching from "Classic Asset-Accounting" to using new Asset Accounting in SAP S/4HANA, with new General Ledger Accounting.If you were using classic General Ledger Accounting before the conversion … Continue reading 10.2 S4TWL – Asset Accounting: Parallel valuation and journal entry – 2270388

12.5 S4TWL Planning – P&L, ProfitCenter, CostCenter, ORder, Project : ACDOCAP

2270407 : S4TWL - Profit and Loss Planning, profit center planning, cost center planning, order planning, and project planning Reason and Prerequisites : This Simplification Item is relevant if:• Profit Center Planning is used if entries exist in Table GLPCP (check with SE16).• CO-OM Planning is used if entries exist in Table COEJ (check with … Continue reading 12.5 S4TWL Planning – P&L, ProfitCenter, CostCenter, ORder, Project : ACDOCAP

12.4 S4TWL – TECHNICAL CHANGES IN CONTROLLING

2270404 : S4TWL - Technical Changes in Controlling : from ERP ECC 6.0 (EHP 7 or higher) to S/4 HANA Business-Process Impact No impact on the standard SAP business processes (Only Technical)In Customized-Implementation migration to S/4HANA : It might be required to adapt Custom Code if fields have been added to the totals table or … Continue reading 12.4 S4TWL – TECHNICAL CHANGES IN CONTROLLING

12.3 S4TWL – Technical Changes in Material Ledger with Actual Costing

SAP NOTE# 2354768 - Technical Changes in Material Ledger with Actual Costing With S/4HANA the data model for material ledger data has been changed significantly, especially when actual costing is active. ( Actual-Costing is Active - Technically this can be verified via database table T001W, field MGVUPD. 'X' means that Material Ledger Actual Costing is active … Continue reading 12.3 S4TWL – Technical Changes in Material Ledger with Actual Costing

2638465 – MRP differences between S/4HANA and ERP systems

Master-NOTE covering MRP-Difference between SAP S/4HANA & SAP ECC Resolution MRP live (T-code MD01N) is suggested to run MRP on S/4HANA systems though Classic MRP t-codes are still available.KBA  2640393 - Differences between t-code MD01N and classic MRP t-codes MD01/MD02/MD03Note 2268085 - S4TWL - MRP live on SAP HANA - MD01NMRP sourcing:Note 2268069 - S4TWL - Simplified SourcingKBA  2614920 - Sourcing priority during MRP in … Continue reading 2638465 – MRP differences between S/4HANA and ERP systems

Finance S4TWL

TOPIC & Sub-TOPIC SAP-NOTE#Summary8. Financials – General 8.1 S4TWL - DATA MODEL CHANGES IN FIN 2270333 8.2 S4TWL - REPLACED TRANSACTION CODES AND PROGRAMS IN FIN  27426138.3 S4TWL - Plan data is not migrated to SAP S/4HANA 9. Financials - Accounts Payable/Accounts Receivable  9.1 S4TWL - Integration with FSCM Biller Direct (FI-AR) 9.2 S4TWL - Integration with FSCM Biller Direct (FI-AP) 10. Financials … Continue reading Finance S4TWL

Manage Production Version

2267880 :S4TWL - BOM, Routing, Production Version Production versions are mandatory in S/4HANA MRP, planned order creation, and production order creation only find a BOM and routing alternative if a production version is maintained for the BOM and routing alternative Business-Benefit / Business CAse From CONFIG to MASTER-DATA, easy Maintainance. In S/4 HANA Production version … Continue reading Manage Production Version