SAP mixed costing --> to cost a material using multiple alternative methods, e.g. when you manufacture a material with different internal processes, then specify these through separate production versions. When we execute a cost estimate the system calculates the cost for each production version then calculates an average unit cost using weighting factors. When we … Continue reading Mixed-Costing (a)Within-a-PLANT (b) Across-Plant/Comp.Code
Category: Product-Costing
Product-Costing User-Exit
Develop Enhancements for Material Costing The following SAP enhancements are available for the area Cost Estimate with Quantity Structure: Costing Reports (SAPLXCKA)Costing Production Resources and Tools (COPCP003)Material Valuation with Cross-Company Costing (COPCP001)Costing Bulk Materials (COPCP004)Valuation Price for Materials from User Exit (COPCP005) Let's have a look at User-Exits for Costing-Reports: SAPLXCKA 1. Costing Reports: SAPLXCKA … Continue reading Product-Costing User-Exit
COGM & COGS in Product Costing
COGM = Cost of Goods Manufactured COGS = Cost of Goods Sold To calculate the COGM and COGS for materials, you can execute a material cost estimate (with or without quantity structure) To calculate the COGM and COGS for products that do not have any master data (such as services or materials at the planning … Continue reading COGM & COGS in Product Costing
12.1 S4TWL – Reference and Simulation Costing : 2349294
12.1 S4TWL - Reference and Simulation Costing Application Components: CO-PC-PCP-REF System Conversion : Check existing processes for cost estimation : If You are currently using base planning objects (i.e CKHS-BZOBJ ='1' has records) to store cost estimates that can be included in cost estimates for projects, sales orders and so on as items of type … Continue reading 12.1 S4TWL – Reference and Simulation Costing : 2349294
WN : 1809 – Controlling – CostingRun – Quantity Structure Explosion
In S/4HANA 1809, In costing runs, quantity structure explosion is now part of the Selection step rather than a separate, optional step in the process flow. Explosion can be triggered with the Multilevel Quantity Structure Explosion option in the Selection step. Business Benefit : You use this option if you want to ensure that the … Continue reading WN : 1809 – Controlling – CostingRun – Quantity Structure Explosion
WN : 1809 – Controlling – CostingRun – Recurrence
Starting 1809 OP, Costing-Run can be set-up for a Recurrence Frequency of Once / Monthly / Quarterly / Yearly. CK40N Costing runs now offer a recurrence feature. This makes it possible to execute a costing run on a monthly, quarterly, or yearly basis without having to create the run manually each time. When you create … Continue reading WN : 1809 – Controlling – CostingRun – Recurrence
You must be logged in to post a comment.