WN : 1809 – Controlling – CostingRun – Quantity Structure Explosion

In S/4HANA 1809, In costing runs, quantity structure explosion is now part of the Selection step rather than a separate, optional step in the process flow. Explosion can be triggered with the Multilevel Quantity Structure Explosion option in the Selection step.

Business Benefit : You use this option if you want to ensure that the semifinished products and raw materials that are part of the value-added process are costed along with the materials selected for costing.

SAP S/4HANA 1809


Below is a screen-shot from a SAP S/4HANA 1709 which shows Structure-Explosion as “flow”-step

SAP S/4HANA 1709

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.